Leaves on the Line

Salisbury

SAL Wessex route
CSV JSON

3,330 delay minutes

The biggest share (18%) of the delay picked up at Salisbury in the four weeks to 9 December 2023 came from how the network was run.

77% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2728%8% 10 a day, more than 2 of the other 4 years-
Signals, points and power50015%16% 18 a day, more than 3 of the other 4 years7
Weather and structures2026%7% 7 a day, more than 2 of the other 4 years8
Autumn35711%7% 13 a day, more than 2 of the other 4 years2
External33210%4% 12 a day, more than 3 of the other 4 years2
Network management61118%17% 22 a day, more than 1 of the other 4 years10
The operators' causes
Train faults50715%16% 18 a day, more than 3 of the other 4 years10
Traincrew2818%11% 10 a day, more than 2 of the other 4 years19
Stations13<1%3% 0 a day, the least in 5 years-
Operations943%5% 3 a day, more than 2 of the other 4 years11
Operator, other1625%7% 6 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)233
MDTechnical failures below the solebar224
IBPoints failure (including no fault found)204
IRBroken/cracked/twisted/buckled/flawed rail178
TGDriver169
QHAdhesion problems due to leaf contamination138
ICTrack circuit failure (including no fault found)128
JFOff track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure)120
OCSignaller including mis-routing (not ERTM /ETCS related)107
Q3NZ Pumps T105
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.22,540
MDTechnical failures below the solebar8,661
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)7,346
TGDriver7,140
ICTrack circuit failure (including no fault found)4,664
IBPoints failure (including no fault found)4,551
IRBroken/cracked/twisted/buckled/flawed rail3,719
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions3,563
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure3,510
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail3,498