Salisbury
3,330 delay minutes
The biggest share (18%) of the delay picked up at Salisbury in the four weeks to 9 December 2023 came from how the network was run.
77% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 272 | 8% | 8% | 10 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 500 | 15% | 16% | 18 a day, more than 3 of the other 4 years | 7 |
| Weather and structures | 202 | 6% | 7% | 7 a day, more than 2 of the other 4 years | 8 |
| Autumn | 357 | 11% | 7% | 13 a day, more than 2 of the other 4 years | 2 |
| External | 332 | 10% | 4% | 12 a day, more than 3 of the other 4 years | 2 |
| Network management | 611 | 18% | 17% | 22 a day, more than 1 of the other 4 years | 10 |
| The operators' causes | |||||
| Train faults | 507 | 15% | 16% | 18 a day, more than 3 of the other 4 years | 10 |
| Traincrew | 281 | 8% | 11% | 10 a day, more than 2 of the other 4 years | 19 |
| Stations | 13 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 94 | 3% | 5% | 3 a day, more than 2 of the other 4 years | 11 |
| Operator, other | 162 | 5% | 7% | 6 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 233 |
| MD | Technical failures below the solebar | 224 |
| IB | Points failure (including no fault found) | 204 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 178 |
| TG | Driver | 169 |
| QH | Adhesion problems due to leaf contamination | 138 |
| IC | Track circuit failure (including no fault found) | 128 |
| JF | Off track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure) | 120 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 107 |
| Q3 | NZ Pumps T | 105 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 22,540 |
| MD | Technical failures below the solebar | 8,661 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 7,346 |
| TG | Driver | 7,140 |
| IC | Track circuit failure (including no fault found) | 4,664 |
| IB | Points failure (including no fault found) | 4,551 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 3,719 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 3,563 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,510 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 3,498 |