10 delay minutes

Most of the delay picked up at South Acton in the four weeks to 9 December 2023 came from signal, points and power faults.

40% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power10100%16%3
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%1
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IASignal failure (including no fault found)6
IHPower Supply And Distribution System Failure4
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)241
TGDriver152
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.149
MCDiesel Loco failure, defect, attention129
J3Axle Counter Failure117
MNBrake and brake systems faults; including wheel flats where no other cause had been identified62
X8Animal Strike or incursion not within the control of Network Rail62
I9Fires starting on Network Rail Infrastructure54
IASignal failure (including no fault found)45
RHStation evacuated due to fire alarm45