South Acton
10 delay minutes
Most of the delay picked up at South Acton in the four weeks to 9 December 2023 came from signal, points and power faults.
40% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 10 | 100% | 16% | 3 |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | 1 |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IA | Signal failure (including no fault found) | 6 |
| IH | Power Supply And Distribution System Failure | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 241 |
| TG | Driver | 152 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 149 |
| MC | Diesel Loco failure, defect, attention | 129 |
| J3 | Axle Counter Failure | 117 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 62 |
| X8 | Animal Strike or incursion not within the control of Network Rail | 62 |
| I9 | Fires starting on Network Rail Infrastructure | 54 |
| IA | Signal failure (including no fault found) | 45 |
| RH | Station evacuated due to fire alarm | 45 |