Stratford-upon-Avon
1,169 delay minutes
The biggest share (24%) of the delay picked up at Stratford-upon-Avon in the four weeks to 9 December 2023 came from traincrew problems.
59% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 125 | 11% | 16% | 4 a day, more than 1 of the other 4 years | 3 |
| Weather and structures | 23 | 2% | 7% | 1 a day, the least in 5 years | - |
| Autumn | 198 | 17% | 7% | 7 a day, the most in 5 years | - |
| External | 35 | 3% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 82 | 7% | 17% | 3 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 157 | 13% | 16% | 6 a day, the least in 5 years | 1 |
| Traincrew | 284 | 24% | 11% | 10 a day, more than 1 of the other 4 years | 24 |
| Stations | 32 | 3% | 3% | 1 a day, the least in 5 years | - |
| Operations | 3 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 230 | 20% | 7% | 8 a day, more than 2 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 244 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 126 |
| Q3 | NZ Pumps T | 109 |
| QH | Adhesion problems due to leaf contamination | 77 |
| TT | Leaf fall Neutral | 74 |
| MD | Technical failures below the solebar | 65 |
| M8 | Technical failures above the Solebar | 54 |
| J3 | Axle Counter Failure | 40 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 32 |
| XP | BRIDGE HIT | 31 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 9,387 |
| MD | Technical failures below the solebar | 5,893 |
| ZU | No Cause Identified After investigation by both Parties | 3,619 |
| TH | (Senior) Conductor/Train Manager | 3,335 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,433 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 2,151 |
| IC | Track circuit failure (including no fault found) | 2,082 |
| RB | Passengers joining/alighting | 1,950 |
| M8 | Technical failures above the Solebar | 1,874 |
| IB | Points failure (including no fault found) | 1,833 |