Saxmundham
551 delay minutes
The biggest share (30%) of the delay picked up at Saxmundham in the four weeks to 9 December 2023 came from how the network was run.
54% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 29 | 5% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 12 | 2% | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | 22 | 4% | 7% | 1 a day, more than 1 of the other 4 years | - |
| Autumn | 61 | 11% | 7% | 2 a day, the most in 5 years | - |
| External | 110 | 20% | 4% | 4 a day, the most in 5 years | - |
| Network management | 167 | 30% | 17% | 6 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 50 | 9% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Traincrew | 51 | 9% | 11% | 2 a day, the most in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 5 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 44 | 8% | 7% | 2 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 97 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 78 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 49 |
| TG | Driver | 40 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 32 |
| M7 | Door and Door system faults | 30 |
| QJ | Special working for leaf-fall track circuit operation | 25 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 23 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 22 |
| FW | Late start/yard overtime not explained by Operator | 16 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,743 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,658 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,605 |
| MD | Technical failures below the solebar | 1,569 |
| MU | Depot operating problem | 1,344 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 1,107 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 946 |
| IC | Track circuit failure (including no fault found) | 936 |
| M7 | Door and Door system faults | 883 |
| M8 | Technical failures above the Solebar | 880 |