Leaves on the Line

Saxmundham

SAX Anglia route
CSV JSON

551 delay minutes

The biggest share (30%) of the delay picked up at Saxmundham in the four weeks to 9 December 2023 came from how the network was run.

54% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track295%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power122%16% 0 a day, the least in 5 years-
Weather and structures224%7% 1 a day, more than 1 of the other 4 years-
Autumn6111%7% 2 a day, the most in 5 years-
External11020%4% 4 a day, the most in 5 years-
Network management16730%17% 6 a day, more than 3 of the other 4 years-
The operators' causes
Train faults509%16% 2 a day, more than 1 of the other 4 years-
Traincrew519%11% 2 a day, the most in 5 years-
Stations--3% 0 a day, the least in 5 years-
Operations5<1%5% 0 a day, the least in 5 years-
Operator, other448%7% 2 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)97
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)78
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards49
TGDriver40
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)32
M7Door and Door system faults30
QJSpecial working for leaf-fall track circuit operation25
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.23
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)22
FWLate start/yard overtime not explained by Operator16
Since 2018
CodeWhat Network Rail loggedMinutes
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,743
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,658
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,605
MDTechnical failures below the solebar1,569
MUDepot operating problem1,344
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)1,107
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)946
ICTrack circuit failure (including no fault found)936
M7Door and Door system faults883
M8Technical failures above the Solebar880