Leaves on the Line

Stourbridge Junction

SBJ Central route
CSV JSON

437 delay minutes

The biggest share (25%) of the delay picked up at Stourbridge Junction in the four weeks to 9 December 2023 came from traincrew problems.

38% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track184%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power8319%16% 3 a day, more than 1 of the other 4 years2
Weather and structures4<1%7% 0 a day, the least in 5 years-
Autumn307%7% 1 a day, the least in 5 years-
External5713%4% 2 a day, more than 3 of the other 4 years1
Network management297%17% 1 a day, the least in 5 years1
The operators' causes
Train faults5312%16% 2 a day, more than 1 of the other 4 years2
Traincrew11025%11% 4 a day, more than 1 of the other 4 years1
Stations225%3% 1 a day, the least in 5 years-
Operations82%5% 0 a day, more than 3 of the other 4 years-
Operator, other235%7% 1 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver107
IBPoints failure (including no fault found)83
XPBRIDGE HIT46
Q3NZ Pumps T19
JSCondition of Track TSR outside the Timetable Planning Rules18
M8Technical failures above the Solebar18
M7Door and Door system faults14
TTLeaf fall Neutral14
QHAdhesion problems due to leaf contamination11
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)11
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver6,113
MDTechnical failures below the solebar5,341
ZUNo Cause Identified After investigation by both Parties3,919
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)3,181
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,002
TH(Senior) Conductor/Train Manager2,904
ICTrack circuit failure (including no fault found)2,863
XPBRIDGE HIT1,917
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,803
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,777