South Bermondsey
19 delay minutes
Most of the delay picked up at South Bermondsey in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | 11 | 58% | 4% | 1 |
| Network management | 8 | 42% | 17% | 1 |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XP | BRIDGE HIT | 11 |
| OA | Regulation Decision Made With Best Endeavours | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 133 |
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 108 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 89 |
| XP | BRIDGE HIT | 68 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 43 |
| IB | Points failure (including no fault found) | 36 |
| VI | Security alert affecting stations and depots | 36 |
| IC | Track circuit failure (including no fault found) | 35 |
| RB | Passengers joining/alighting | 33 |
| MU | Depot operating problem | 33 |