Leaves on the Line

Selby

SBY North & East route
CSV JSON

1,089 delay minutes

The biggest share (27%) of the delay picked up at Selby in the four weeks to 9 December 2023 came from faulty trains.

66% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track222%8% 1 a day, more than 1 of the other 4 years1
Signals, points and power1009%16% 4 a day, more than 1 of the other 4 years1
Weather and structures535%7% 2 a day, more than 3 of the other 4 years2
Autumn16415%7% 6 a day, more than 3 of the other 4 years-
External272%4% 1 a day, more than 3 of the other 4 years3
Network management18317%17% 7 a day, more than 3 of the other 4 years8
The operators' causes
Train faults29027%16% 10 a day, the most in 5 years7
Traincrew12712%11% 5 a day, more than 2 of the other 4 years8
Stations424%3% 2 a day, more than 3 of the other 4 years-
Operations434%5% 2 a day, more than 3 of the other 4 years-
Operator, other394%7% 1 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OUDelays not Investigated by Network Rail105
MNBrake and brake systems faults; including wheel flats where no other cause had been identified84
TGDriver84
QJSpecial working for leaf-fall track circuit operation80
QICautioning due to railhead leaf contamination61
MDTechnical failures below the solebar58
ICTrack circuit failure (including no fault found)49
MUDepot operating problem36
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail29
M7Door and Door system faults28
Since 2018
CodeWhat Network Rail loggedMinutes
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles3,070
TGDriver2,281
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,969
MDTechnical failures below the solebar1,953
IBPoints failure (including no fault found)1,524
IASignal failure (including no fault found)1,455
OCSignaller including mis-routing (not ERTM /ETCS related)1,183
ICTrack circuit failure (including no fault found)1,171
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,119
M7Door and Door system faults1,059