Selby
1,089 delay minutes
The biggest share (27%) of the delay picked up at Selby in the four weeks to 9 December 2023 came from faulty trains.
66% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 22 | 2% | 8% | 1 a day, more than 1 of the other 4 years | 1 |
| Signals, points and power | 100 | 9% | 16% | 4 a day, more than 1 of the other 4 years | 1 |
| Weather and structures | 53 | 5% | 7% | 2 a day, more than 3 of the other 4 years | 2 |
| Autumn | 164 | 15% | 7% | 6 a day, more than 3 of the other 4 years | - |
| External | 27 | 2% | 4% | 1 a day, more than 3 of the other 4 years | 3 |
| Network management | 183 | 17% | 17% | 7 a day, more than 3 of the other 4 years | 8 |
| The operators' causes | |||||
| Train faults | 290 | 27% | 16% | 10 a day, the most in 5 years | 7 |
| Traincrew | 127 | 12% | 11% | 5 a day, more than 2 of the other 4 years | 8 |
| Stations | 42 | 4% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 43 | 4% | 5% | 2 a day, more than 3 of the other 4 years | - |
| Operator, other | 39 | 4% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 105 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 84 |
| TG | Driver | 84 |
| QJ | Special working for leaf-fall track circuit operation | 80 |
| QI | Cautioning due to railhead leaf contamination | 61 |
| MD | Technical failures below the solebar | 58 |
| IC | Track circuit failure (including no fault found) | 49 |
| MU | Depot operating problem | 36 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 29 |
| M7 | Door and Door system faults | 28 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 3,070 |
| TG | Driver | 2,281 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,969 |
| MD | Technical failures below the solebar | 1,953 |
| IB | Points failure (including no fault found) | 1,524 |
| IA | Signal failure (including no fault found) | 1,455 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,183 |
| IC | Track circuit failure (including no fault found) | 1,171 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,119 |
| M7 | Door and Door system faults | 1,059 |