Scarborough
566 delay minutes
The biggest share (24%) of the delay picked up at Scarborough in the four weeks to 9 December 2023 came from faulty trains.
75% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 25 | 4% | 8% | 1 a day, more than 1 of the other 4 years | 1 |
| Signals, points and power | 74 | 13% | 16% | 3 a day, more than 1 of the other 4 years | - |
| Weather and structures | 62 | 11% | 7% | 2 a day, the most in 5 years | - |
| Autumn | 29 | 5% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | 30 | 5% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 32 | 6% | 17% | 1 a day, the least in 5 years | 15 |
| The operators' causes | |||||
| Train faults | 135 | 24% | 16% | 5 a day, the least in 5 years | 6 |
| Traincrew | 128 | 23% | 11% | 5 a day, more than 2 of the other 4 years | 6 |
| Stations | 31 | 5% | 3% | 1 a day, more than 3 of the other 4 years | 1 |
| Operations | 20 | 4% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 87 |
| MD | Technical failures below the solebar | 84 |
| TH | (Senior) Conductor/Train Manager | 41 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 37 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 32 |
| M7 | Door and Door system faults | 31 |
| JK | Flooding not due to exceptional weather | 25 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 20 |
| MU | Depot operating problem | 20 |
| JT | Points failure caused by snow or frost where heaters are not fitted | 19 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 3,276 |
| MD | Technical failures below the solebar | 3,018 |
| M8 | Technical failures above the Solebar | 2,526 |
| M7 | Door and Door system faults | 1,446 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,441 |
| IC | Track circuit failure (including no fault found) | 1,367 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,181 |
| TH | (Senior) Conductor/Train Manager | 1,156 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,044 |
| MU | Depot operating problem | 957 |