3,401 delay minutes

The biggest share (17%) of the delay picked up at Stechford in the four weeks to 9 December 2023 came from faulty trains.

90% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2909%8% 10 a day, more than 2 of the other 4 years-
Signals, points and power56617%16% 20 a day, more than 2 of the other 4 years-
Weather and structures1053%7% 4 a day, more than 1 of the other 4 years-
Autumn1234%7% 4 a day, the most in 5 years-
External33710%4% 12 a day, the most in 5 years-
Network management41412%17% 15 a day, more than 1 of the other 4 years-
The operators' causes
Train faults58117%16% 21 a day, more than 2 of the other 4 years-
Traincrew57917%11% 21 a day, more than 3 of the other 4 years-
Stations1073%3% 4 a day, more than 1 of the other 4 years-
Operations582%5% 2 a day, the least in 5 years-
Operator, other2437%7% 9 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver415
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)310
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.274
IBPoints failure (including no fault found)224
MDTechnical failures below the solebar129
J3Axle Counter Failure113
J8OTM DAMAGE108
MNBrake and brake systems faults; including wheel flats where no other cause had been identified108
VHPassenger Communication cord, door egress or emergency train alarm operated107
M8Technical failures above the Solebar85
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver15,987
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.8,972
IBPoints failure (including no fault found)7,370
TH(Senior) Conductor/Train Manager6,706
MDTechnical failures below the solebar6,409
M8Technical failures above the Solebar5,751
I1Overhead line/third rail defect5,612
J3Axle Counter Failure4,801
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure4,139
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,978