Stechford
3,401 delay minutes
The biggest share (17%) of the delay picked up at Stechford in the four weeks to 9 December 2023 came from faulty trains.
90% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 290 | 9% | 8% | 10 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 566 | 17% | 16% | 20 a day, more than 2 of the other 4 years | - |
| Weather and structures | 105 | 3% | 7% | 4 a day, more than 1 of the other 4 years | - |
| Autumn | 123 | 4% | 7% | 4 a day, the most in 5 years | - |
| External | 337 | 10% | 4% | 12 a day, the most in 5 years | - |
| Network management | 414 | 12% | 17% | 15 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 581 | 17% | 16% | 21 a day, more than 2 of the other 4 years | - |
| Traincrew | 579 | 17% | 11% | 21 a day, more than 3 of the other 4 years | - |
| Stations | 107 | 3% | 3% | 4 a day, more than 1 of the other 4 years | - |
| Operations | 58 | 2% | 5% | 2 a day, the least in 5 years | - |
| Operator, other | 243 | 7% | 7% | 9 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 415 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 310 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 274 |
| IB | Points failure (including no fault found) | 224 |
| MD | Technical failures below the solebar | 129 |
| J3 | Axle Counter Failure | 113 |
| J8 | OTM DAMAGE | 108 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 108 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 107 |
| M8 | Technical failures above the Solebar | 85 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 15,987 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 8,972 |
| IB | Points failure (including no fault found) | 7,370 |
| TH | (Senior) Conductor/Train Manager | 6,706 |
| MD | Technical failures below the solebar | 6,409 |
| M8 | Technical failures above the Solebar | 5,751 |
| I1 | Overhead line/third rail defect | 5,612 |
| J3 | Axle Counter Failure | 4,801 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,139 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,978 |