Scunthorpe

SCU North & East route
CSV JSON

96 delay minutes

Most of the delay picked up at Scunthorpe in the four weeks to 9 December 2023 came from signal, points and power faults.

4% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power5153%16% 2 a day, more than 2 of the other 4 years1
Weather and structures--7% 0 a day, the least in 5 years-
Autumn66%7% 0 a day, the most in 5 years-
External33%4% 0 a day, more than 2 of the other 4 years-
Network management33%17% 0 a day, the least in 5 years-
The operators' causes
Train faults1718%16% 1 a day, more than 3 of the other 4 years2
Traincrew1010%11% 0 a day, more than 1 of the other 4 years2
Stations33%3% 0 a day, more than 2 of the other 4 years-
Operations22%5% 0 a day, more than 2 of the other 4 years-
Operator, other11%7% 0 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IESignalling Functional Power Supply Failure47
M7Door and Door system faults17
TH(Senior) Conductor/Train Manager10
QICautioning due to railhead leaf contamination5
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure4
OUDelays not Investigated by Network Rail3
RQUn-booked assistance for a person with reduced mobility joining/alighting,3
XQSwing bridge open for river or canal traffic3
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)2
MPRail / wheel interface, adhesion problems (including ice on the running rail)1
Since 2018
CodeWhat Network Rail loggedMinutes
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)1,939
M7Door and Door system faults978
TH(Senior) Conductor/Train Manager514
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.507
ICTrack circuit failure (including no fault found)485
MCDiesel Loco failure, defect, attention469
IBPoints failure (including no fault found)460
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure452
FWLate start/yard overtime not explained by Operator422
IRBroken/cracked/twisted/buckled/flawed rail420