Sandbach
1,792 delay minutes
The biggest share (20%) of the delay picked up at Sandbach in the four weeks to 9 December 2023 came from faulty trains.
70% of these minutes were knock-on from something that happened elsewhere first. 84% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 195 | 11% | 8% | 7 a day, the most in 5 years | - |
| Signals, points and power | 288 | 16% | 16% | 10 a day, more than 3 of the other 4 years | 1 |
| Weather and structures | 43 | 2% | 7% | 2 a day, more than 2 of the other 4 years | - |
| Autumn | 119 | 7% | 7% | 4 a day, the most in 5 years | - |
| External | 42 | 2% | 4% | 2 a day, more than 3 of the other 4 years | - |
| Network management | 266 | 15% | 17% | 10 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 354 | 20% | 16% | 13 a day, more than 3 of the other 4 years | - |
| Traincrew | 192 | 11% | 11% | 7 a day, more than 3 of the other 4 years | - |
| Stations | 56 | 3% | 3% | 2 a day, more than 2 of the other 4 years | - |
| Operations | 41 | 2% | 5% | 1 a day, the least in 5 years | - |
| Operator, other | 196 | 11% | 7% | 7 a day, the most in 5 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 191 |
| TG | Driver | 120 |
| Q3 | NZ Pumps T | 99 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 86 |
| IB | Points failure (including no fault found) | 79 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 79 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 72 |
| TT | Leaf fall Neutral | 72 |
| MD | Technical failures below the solebar | 44 |
| OU | Delays not Investigated by Network Rail | 44 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 3,104 |
| MD | Technical failures below the solebar | 2,513 |
| IB | Points failure (including no fault found) | 2,170 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,019 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,803 |
| I1 | Overhead line/third rail defect | 1,788 |
| IC | Track circuit failure (including no fault found) | 1,788 |
| M8 | Technical failures above the Solebar | 1,636 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,541 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,452 |