St Denys
3,216 delay minutes
The biggest share (30%) of the delay picked up at St Denys in the four weeks to 9 December 2023 came from signal, points and power faults.
71% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 175 | 5% | 8% | 6 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 966 | 30% | 16% | 35 a day, the most in 5 years | - |
| Weather and structures | 52 | 2% | 7% | 2 a day, more than 2 of the other 4 years | - |
| Autumn | 210 | 7% | 7% | 8 a day, more than 3 of the other 4 years | - |
| External | 81 | 3% | 4% | 3 a day, the least in 5 years | - |
| Network management | 617 | 19% | 17% | 22 a day, the most in 5 years | 1 |
| The operators' causes | |||||
| Train faults | 604 | 19% | 16% | 22 a day, the most in 5 years | 1 |
| Traincrew | 194 | 6% | 11% | 7 a day, more than 2 of the other 4 years | - |
| Stations | 76 | 2% | 3% | 3 a day, more than 2 of the other 4 years | - |
| Operations | 39 | 1% | 5% | 1 a day, the least in 5 years | - |
| Operator, other | 203 | 6% | 7% | 7 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IE | Signalling Functional Power Supply Failure | 477 |
| MD | Technical failures below the solebar | 395 |
| IB | Points failure (including no fault found) | 190 |
| Q3 | NZ Pumps T | 175 |
| TT | Leaf fall Neutral | 175 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 136 |
| II | Signalling lineside cable fault | 133 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 133 |
| TG | Driver | 124 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 93 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 8,647 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 5,699 |
| I4 | OHLE/third rail power supply failure or reduction | 3,588 |
| IC | Track circuit failure (including no fault found) | 3,571 |
| TG | Driver | 3,527 |
| MD | Technical failures below the solebar | 2,913 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,682 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 2,655 |
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 2,589 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 2,490 |