20 delay minutes

Most of the delay picked up at Sandwich in the four weeks to 9 December 2023 came from signal, points and power faults.

70% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power1155%16%1
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management630%17%-
The operators' causes
Train faults--16%1
Traincrew--11%-
Stations--3%-
Operations315%5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)11
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)6
TZOther Passenger Train Operating Company causes3
Since 2018
CodeWhat Network Rail loggedMinutes
TZOther Passenger Train Operating Company causes108
IBPoints failure (including no fault found)87
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards85
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions78
OCSignaller including mis-routing (not ERTM /ETCS related)76
TH(Senior) Conductor/Train Manager67
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)57
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)44
M0Confirmed train cab based safety system fault (including GSMR)41
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles38