321 delay minutes

The biggest share (25%) of the delay picked up at Seaham in the four weeks to 9 December 2023 came from how the network was run.

70% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track227%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power155%16% 1 a day, the least in 5 years-
Weather and structures186%7% 1 a day, more than 3 of the other 4 years-
Autumn--7% 0 a day, the least in 5 years-
External3411%4% 1 a day, the most in 5 years-
Network management8025%17% 3 a day, the most in 5 years-
The operators' causes
Train faults3712%16% 1 a day, more than 1 of the other 4 years-
Traincrew62%11% 0 a day, more than 1 of the other 4 years-
Stations3511%3% 1 a day, more than 3 of the other 4 years-
Operations5417%5% 2 a day, more than 3 of the other 4 years-
Operator, other217%7% 1 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OUDelays not Investigated by Network Rail45
TZOther Passenger Train Operating Company causes40
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)32
MNBrake and brake systems faults; including wheel flats where no other cause had been identified24
XRCable vandalism or theft23
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.19
FWLate start/yard overtime not explained by Operator18
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail18
RCre-booked assistance for a person with reduced mobility joining/alighting,15
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)14
Since 2018
CodeWhat Network Rail loggedMinutes
TZOther Passenger Train Operating Company causes1,152
MDTechnical failures below the solebar877
RBPassengers joining/alighting728
TGDriver643
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.530
IBPoints failure (including no fault found)507
RCre-booked assistance for a person with reduced mobility joining/alighting,505
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure445
ICTrack circuit failure (including no fault found)436
OCSignaller including mis-routing (not ERTM /ETCS related)418