Sellafield
934 delay minutes
The biggest share (36%) of the delay picked up at Sellafield in the four weeks to 9 December 2023 came from weather and structures.
46% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 14 | 1% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 40 | 4% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Weather and structures | 336 | 36% | 7% | 12 a day, more than 3 of the other 4 years | 1 |
| Autumn | 11 | 1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | 5 | <1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 328 | 35% | 17% | 12 a day, the most in 5 years | 5 |
| The operators' causes | |||||
| Train faults | 42 | 4% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Traincrew | 69 | 7% | 11% | 2 a day, more than 3 of the other 4 years | 2 |
| Stations | 20 | 2% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 54 | 6% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 17 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XT | Severe snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy) | 307 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 210 |
| TG | Driver | 56 |
| T8 | Delays at Station believed to be operator cause and Information required from operator (Ops responsibility) | 33 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 28 |
| IB | Points failure (including no fault found) | 25 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 25 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 24 |
| Q1 | Takeback Pumps | 21 |
| MD | Technical failures below the solebar | 20 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 4,933 |
| JK | Flooding not due to exceptional weather | 3,734 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,597 |
| IL | Token equipment failure (including no fault found) | 1,431 |
| TG | Driver | 1,429 |
| IA | Signal failure (including no fault found) | 1,328 |
| MD | Technical failures below the solebar | 1,225 |
| RB | Passengers joining/alighting | 1,213 |
| IC | Track circuit failure (including no fault found) | 822 |
| TH | (Senior) Conductor/Train Manager | 733 |