Leaves on the Line

Sellafield

SEL North West route
CSV JSON

934 delay minutes

The biggest share (36%) of the delay picked up at Sellafield in the four weeks to 9 December 2023 came from weather and structures.

46% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track141%8% 1 a day, the least in 5 years-
Signals, points and power404%16% 1 a day, more than 2 of the other 4 years-
Weather and structures33636%7% 12 a day, more than 3 of the other 4 years1
Autumn111%7% 0 a day, more than 3 of the other 4 years-
External5<1%4% 0 a day, more than 1 of the other 4 years-
Network management32835%17% 12 a day, the most in 5 years5
The operators' causes
Train faults424%16% 2 a day, more than 1 of the other 4 years-
Traincrew697%11% 2 a day, more than 3 of the other 4 years2
Stations202%3% 1 a day, more than 2 of the other 4 years-
Operations546%5% 2 a day, the most in 5 years-
Operator, other172%7% 1 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XTSevere snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy)307
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)210
TGDriver56
T8Delays at Station believed to be operator cause and Information required from operator (Ops responsibility)33
OCSignaller including mis-routing (not ERTM /ETCS related)28
IBPoints failure (including no fault found)25
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)25
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed24
Q1Takeback Pumps21
MDTechnical failures below the solebar20
Since 2018
CodeWhat Network Rail loggedMinutes
JSCondition of Track TSR outside the Timetable Planning Rules4,933
JKFlooding not due to exceptional weather3,734
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,597
ILToken equipment failure (including no fault found)1,431
TGDriver1,429
IASignal failure (including no fault found)1,328
MDTechnical failures below the solebar1,225
RBPassengers joining/alighting1,213
ICTrack circuit failure (including no fault found)822
TH(Senior) Conductor/Train Manager733