583 delay minutes

The biggest share (33%) of the delay picked up at Seamer in the four weeks to 9 December 2023 came from signal, points and power faults.

67% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track142%8% 1 a day, the least in 5 years-
Signals, points and power19133%16% 7 a day, more than 2 of the other 4 years-
Weather and structures122%7% 0 a day, more than 2 of the other 4 years-
Autumn5910%7% 2 a day, the most in 5 years-
External417%4% 1 a day, more than 3 of the other 4 years-
Network management9316%17% 3 a day, more than 3 of the other 4 years-
The operators' causes
Train faults6010%16% 2 a day, more than 2 of the other 4 years-
Traincrew498%11% 2 a day, the most in 5 years-
Stations366%3% 1 a day, more than 3 of the other 4 years-
Operations264%5% 1 a day, the most in 5 years-
Operator, other2<1%7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles57
OUDelays not Investigated by Network Rail46
JTPoints failure caused by snow or frost where heaters are not fitted35
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed34
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)27
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident26
TGDriver26
IKTelecom equipment failure (including no fault found)23
TH(Senior) Conductor/Train Manager23
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure21
Since 2018
CodeWhat Network Rail loggedMinutes
JSCondition of Track TSR outside the Timetable Planning Rules3,189
ICTrack circuit failure (including no fault found)1,535
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,411
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,400
MDTechnical failures below the solebar1,238
TGDriver1,095
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles965
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)784
M8Technical failures above the Solebar705
OCSignaller including mis-routing (not ERTM /ETCS related)665