Seamer
583 delay minutes
The biggest share (33%) of the delay picked up at Seamer in the four weeks to 9 December 2023 came from signal, points and power faults.
67% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 14 | 2% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 191 | 33% | 16% | 7 a day, more than 2 of the other 4 years | - |
| Weather and structures | 12 | 2% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | 59 | 10% | 7% | 2 a day, the most in 5 years | - |
| External | 41 | 7% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 93 | 16% | 17% | 3 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 60 | 10% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Traincrew | 49 | 8% | 11% | 2 a day, the most in 5 years | - |
| Stations | 36 | 6% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | 26 | 4% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 2 | <1% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 57 |
| OU | Delays not Investigated by Network Rail | 46 |
| JT | Points failure caused by snow or frost where heaters are not fitted | 35 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 34 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 27 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 26 |
| TG | Driver | 26 |
| IK | Telecom equipment failure (including no fault found) | 23 |
| TH | (Senior) Conductor/Train Manager | 23 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 21 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 3,189 |
| IC | Track circuit failure (including no fault found) | 1,535 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,411 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,400 |
| MD | Technical failures below the solebar | 1,238 |
| TG | Driver | 1,095 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 965 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 784 |
| M8 | Technical failures above the Solebar | 705 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 665 |