283 delay minutes

The biggest share (34%) of the delay picked up at St Erth in the four weeks to 9 December 2023 came from signal, points and power faults.

50% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3613%8% 1 a day, the most in 5 years-
Signals, points and power9634%16% 3 a day, more than 1 of the other 4 years2
Weather and structures176%7% 1 a day, more than 2 of the other 4 years-
Autumn52%7% 0 a day, the least in 5 years-
External31%4% 0 a day, more than 2 of the other 4 years-
Network management3512%17% 1 a day, more than 3 of the other 4 years-
The operators' causes
Train faults5419%16% 2 a day, more than 2 of the other 4 years6
Traincrew104%11% 0 a day, the least in 5 years8
Stations166%3% 1 a day, the most in 5 years-
Operations62%5% 0 a day, more than 3 of the other 4 years2
Operator, other52%7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)73
OUDelays not Investigated by Network Rail24
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps22
IRBroken/cracked/twisted/buckled/flawed rail16
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.16
M7Door and Door system faults13
TGDriver10
MUDepot operating problem9
IASignal failure (including no fault found)8
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail8
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar1,231
TGDriver1,068
ICTrack circuit failure (including no fault found)1,045
M7Door and Door system faults898
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.859
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail761
MNBrake and brake systems faults; including wheel flats where no other cause had been identified688
IASignal failure (including no fault found)664
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles605
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure449