Sevenoaks
2,347 delay minutes
The biggest share (27%) of the delay picked up at Sevenoaks in the four weeks to 9 December 2023 came from other operator causes.
82% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 38 | 2% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 218 | 9% | 16% | 8 a day, the least in 5 years | 2 |
| Weather and structures | 3 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 361 | 15% | 7% | 13 a day, more than 1 of the other 4 years | - |
| External | 37 | 2% | 4% | 1 a day, the least in 5 years | - |
| Network management | 449 | 19% | 17% | 16 a day, the least in 5 years | 20 |
| The operators' causes | |||||
| Train faults | 407 | 17% | 16% | 15 a day, more than 2 of the other 4 years | 11 |
| Traincrew | 153 | 6% | 11% | 5 a day, more than 2 of the other 4 years | 14 |
| Stations | 25 | 1% | 3% | 1 a day, the least in 5 years | - |
| Operations | 26 | 1% | 5% | 1 a day, the least in 5 years | - |
| Operator, other | 631 | 27% | 7% | 23 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 354 |
| TT | Leaf fall Neutral | 352 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 230 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 131 |
| TG | Driver | 115 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 109 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 95 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 91 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 69 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 61 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 13,983 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 10,180 |
| TG | Driver | 9,907 |
| IC | Track circuit failure (including no fault found) | 9,648 |
| TT | Leaf fall Neutral | 5,986 |
| IB | Points failure (including no fault found) | 5,915 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 5,524 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 4,986 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,854 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,254 |