Leaves on the Line

Sevenoaks

SEV Kent route
CSV JSON

2,347 delay minutes

The biggest share (27%) of the delay picked up at Sevenoaks in the four weeks to 9 December 2023 came from other operator causes.

82% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track382%8% 1 a day, the least in 5 years-
Signals, points and power2189%16% 8 a day, the least in 5 years2
Weather and structures3<1%7% 0 a day, more than 1 of the other 4 years-
Autumn36115%7% 13 a day, more than 1 of the other 4 years-
External372%4% 1 a day, the least in 5 years-
Network management44919%17% 16 a day, the least in 5 years20
The operators' causes
Train faults40717%16% 15 a day, more than 2 of the other 4 years11
Traincrew1536%11% 5 a day, more than 2 of the other 4 years14
Stations251%3% 1 a day, the least in 5 years-
Operations261%5% 1 a day, the least in 5 years-
Operator, other63127%7% 23 a day, more than 1 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T354
TTLeaf fall Neutral352
VHPassenger Communication cord, door egress or emergency train alarm operated230
M0Confirmed train cab based safety system fault (including GSMR)131
TGDriver115
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)109
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive95
MNBrake and brake systems faults; including wheel flats where no other cause had been identified91
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure69
OCSignaller including mis-routing (not ERTM /ETCS related)61
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)13,983
IRBroken/cracked/twisted/buckled/flawed rail10,180
TGDriver9,907
ICTrack circuit failure (including no fault found)9,648
TTLeaf fall Neutral5,986
IBPoints failure (including no fault found)5,915
VHPassenger Communication cord, door egress or emergency train alarm operated5,524
JSCondition of Track TSR outside the Timetable Planning Rules4,986
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4,854
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure4,254