150 delay minutes

The biggest share (27%) of the delay picked up at Stanford-le-Hope in the four weeks to 9 December 2023 came from faulty trains.

31% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track53%8% 0 a day, more than 3 of the other 4 years-
Signals, points and power2517%16% 1 a day, more than 2 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn96%7% 0 a day, the most in 5 years-
External85%4% 0 a day, more than 3 of the other 4 years-
Network management4027%17% 1 a day, the most in 5 years2
The operators' causes
Train faults4127%16% 1 a day, the most in 5 years1
Traincrew96%11% 0 a day, more than 3 of the other 4 years1
Stations1<1%3% 0 a day, more than 2 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other128%7% 0 a day, the most in 5 years2

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M8Technical failures above the Solebar25
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles24
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)19
MUDepot operating problem14
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)7
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)5
MPRail / wheel interface, adhesion problems (including ice on the running rail)5
Q3NZ Pumps T5
FWLate start/yard overtime not explained by Operator4
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)1,479
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,155
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.759
JFOff track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure)737
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)716
IRBroken/cracked/twisted/buckled/flawed rail492
X8Animal Strike or incursion not within the control of Network Rail321
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)308
TGDriver284
OCSignaller including mis-routing (not ERTM /ETCS related)270