150 delay minutes
The biggest share (27%) of the delay picked up at Stanford-le-Hope in the four weeks to 9 December 2023 came from faulty trains.
31% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 5 | 3% | 8% | 0 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 25 | 17% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 9 | 6% | 7% | 0 a day, the most in 5 years | - |
| External | 8 | 5% | 4% | 0 a day, more than 3 of the other 4 years | - |
| Network management | 40 | 27% | 17% | 1 a day, the most in 5 years | 2 |
| The operators' causes | |||||
| Train faults | 41 | 27% | 16% | 1 a day, the most in 5 years | 1 |
| Traincrew | 9 | 6% | 11% | 0 a day, more than 3 of the other 4 years | 1 |
| Stations | 1 | <1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 12 | 8% | 7% | 0 a day, the most in 5 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M8 | Technical failures above the Solebar | 25 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 24 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 19 |
| MU | Depot operating problem | 14 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 7 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 5 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 5 |
| Q3 | NZ Pumps T | 5 |
| FW | Late start/yard overtime not explained by Operator | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 1,479 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,155 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 759 |
| JF | Off track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure) | 737 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 716 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 492 |
| X8 | Animal Strike or incursion not within the control of Network Rail | 321 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 308 |
| TG | Driver | 284 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 270 |