412 delay minutes

The biggest share (42%) of the delay picked up at Shalford (Surrey) in the four weeks to 9 December 2023 came from signal, points and power faults.

25% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power17442%16% 6 a day, more than 2 of the other 4 years-
Weather and structures3<1%7% 0 a day, more than 1 of the other 4 years-
Autumn5112%7% 2 a day, the least in 5 years-
External82%4% 0 a day, more than 2 of the other 4 years-
Network management9323%17% 3 a day, more than 1 of the other 4 years6
The operators' causes
Train faults318%16% 1 a day, more than 1 of the other 4 years6
Traincrew61%11% 0 a day, the least in 5 years-
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other4611%7% 2 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IKTelecom equipment failure (including no fault found)131
Q3NZ Pumps T46
TTLeaf fall Neutral46
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)33
OCSignaller including mis-routing (not ERTM /ETCS related)27
MUDepot operating problem24
ICTrack circuit failure (including no fault found)23
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles13
OMTechnical failure associated with a Railhead conditioning train13
QNVSTP Schedule/ VSTP Process (TSI created schedule)7
Since 2018
CodeWhat Network Rail loggedMinutes
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,848
ICTrack circuit failure (including no fault found)1,683
ZUNo Cause Identified After investigation by both Parties1,154
MDTechnical failures below the solebar967
IISignalling lineside cable fault939
IKTelecom equipment failure (including no fault found)914
Q3NZ Pumps T870
TTLeaf fall Neutral843
IASignal failure (including no fault found)831
OCSignaller including mis-routing (not ERTM /ETCS related)791