Shalford (Surrey)
412 delay minutes
The biggest share (42%) of the delay picked up at Shalford (Surrey) in the four weeks to 9 December 2023 came from signal, points and power faults.
25% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 174 | 42% | 16% | 6 a day, more than 2 of the other 4 years | - |
| Weather and structures | 3 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 51 | 12% | 7% | 2 a day, the least in 5 years | - |
| External | 8 | 2% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 93 | 23% | 17% | 3 a day, more than 1 of the other 4 years | 6 |
| The operators' causes | |||||
| Train faults | 31 | 8% | 16% | 1 a day, more than 1 of the other 4 years | 6 |
| Traincrew | 6 | 1% | 11% | 0 a day, the least in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 46 | 11% | 7% | 2 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IK | Telecom equipment failure (including no fault found) | 131 |
| Q3 | NZ Pumps T | 46 |
| TT | Leaf fall Neutral | 46 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 33 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 27 |
| MU | Depot operating problem | 24 |
| IC | Track circuit failure (including no fault found) | 23 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 13 |
| OM | Technical failure associated with a Railhead conditioning train | 13 |
| QN | VSTP Schedule/ VSTP Process (TSI created schedule) | 7 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,848 |
| IC | Track circuit failure (including no fault found) | 1,683 |
| ZU | No Cause Identified After investigation by both Parties | 1,154 |
| MD | Technical failures below the solebar | 967 |
| II | Signalling lineside cable fault | 939 |
| IK | Telecom equipment failure (including no fault found) | 914 |
| Q3 | NZ Pumps T | 870 |
| TT | Leaf fall Neutral | 843 |
| IA | Signal failure (including no fault found) | 831 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 791 |