St Germans
408 delay minutes
The biggest share (33%) of the delay picked up at St Germans in the four weeks to 9 December 2023 came from signal, points and power faults.
49% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 92 | 23% | 8% | 3 a day, the most in 5 years | - |
| Signals, points and power | 134 | 33% | 16% | 5 a day, more than 2 of the other 4 years | - |
| Weather and structures | 13 | 3% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | 25 | 6% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 3 | <1% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 51 | 13% | 17% | 2 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 52 | 13% | 16% | 2 a day, the most in 5 years | - |
| Traincrew | 12 | 3% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | 5 | 1% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 21 | 5% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IA | Signal failure (including no fault found) | 102 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 70 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 34 |
| IC | Track circuit failure (including no fault found) | 23 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 22 |
| Q3 | NZ Pumps T | 21 |
| OU | Delays not Investigated by Network Rail | 19 |
| TT | Leaf fall Neutral | 19 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 12 |
| TG | Driver | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| J3 | Axle Counter Failure | 1,735 |
| IA | Signal failure (including no fault found) | 950 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 939 |
| IC | Track circuit failure (including no fault found) | 855 |
| IB | Points failure (including no fault found) | 745 |
| TG | Driver | 662 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 578 |
| MD | Technical failures below the solebar | 577 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 547 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 518 |