Leaves on the Line

Shirebrook

SHB North & East route
CSV JSON

6 delay minutes

The biggest share (50%) of the delay picked up at Shirebrook in the four weeks to 9 December 2023 came from how the network was run.

0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%1
Autumn--7%-
External--4%-
Network management350%17%-
The operators' causes
Train faults--16%-
Traincrew350%11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q1Takeback Pumps3
TGDriver3
Since 2018
CodeWhat Network Rail loggedMinutes
XLFire external to but directly affecting the network (incl. line blocks for emergency services attending off network incidents)51
XPBRIDGE HIT11
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure6
X3Lightning Strike - damage to protected systems6
XRCable vandalism or theft4
TGDriver3
Q1Takeback Pumps3
M7Door and Door system faults2