Sheffield
13,137 delay minutes
The biggest share (16%) of the delay picked up at Sheffield in the four weeks to 9 December 2023 came from how the network was run.
72% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 1,117 | 9% | 8% | 40 a day, more than 2 of the other 4 years | 10 |
| Signals, points and power | 1,375 | 10% | 16% | 49 a day, more than 2 of the other 4 years | 9 |
| Weather and structures | 1,166 | 9% | 7% | 42 a day, more than 3 of the other 4 years | 18 |
| Autumn | 1,064 | 8% | 7% | 38 a day, more than 3 of the other 4 years | 2 |
| External | 398 | 3% | 4% | 14 a day, more than 2 of the other 4 years | 5 |
| Network management | 2,132 | 16% | 17% | 76 a day, more than 2 of the other 4 years | 49 |
| The operators' causes | |||||
| Train faults | 2,032 | 15% | 16% | 73 a day, more than 2 of the other 4 years | 33 |
| Traincrew | 2,085 | 16% | 11% | 74 a day, more than 3 of the other 4 years | 227 |
| Stations | 553 | 4% | 3% | 20 a day, more than 3 of the other 4 years | 1 |
| Operations | 595 | 5% | 5% | 21 a day, more than 3 of the other 4 years | 6 |
| Operator, other | 621 | 5% | 7% | 22 a day, more than 2 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,218 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 720 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 688 |
| OU | Delays not Investigated by Network Rail | 639 |
| MD | Technical failures below the solebar | 621 |
| QJ | Special working for leaf-fall track circuit operation | 601 |
| TH | (Senior) Conductor/Train Manager | 596 |
| IH | Power Supply And Distribution System Failure | 507 |
| M8 | Technical failures above the Solebar | 362 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 352 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 44,747 |
| MD | Technical failures below the solebar | 35,119 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 29,333 |
| M8 | Technical failures above the Solebar | 17,980 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 17,704 |
| TH | (Senior) Conductor/Train Manager | 17,086 |
| IB | Points failure (including no fault found) | 15,483 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 15,058 |
| M7 | Door and Door system faults | 13,849 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 10,782 |