Sheringham
117 delay minutes
The biggest share (28%) of the delay picked up at Sheringham in the four weeks to 9 December 2023 came from other operator causes.
92% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 7 | 6% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 14 | 12% | 16% | 1 a day, more than 2 of the other 4 years | 6 |
| Weather and structures | 8 | 7% | 7% | 0 a day, the most in 5 years | - |
| Autumn | 26 | 22% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 30 | 26% | 17% | 1 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | - | - | 16% | 0 a day, the least in 5 years | - |
| Traincrew | - | - | 11% | 0 a day, the least in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 33 | 28% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| FW | Late start/yard overtime not explained by Operator | 18 |
| Q3 | NZ Pumps T | 15 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 14 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 12 |
| OA | Regulation Decision Made With Best Endeavours | 11 |
| QJ | Special working for leaf-fall track circuit operation | 11 |
| TT | Leaf fall Neutral | 11 |
| JK | Flooding not due to exceptional weather | 8 |
| JB | Reactionary Delay to 'P' coded TSRs | 6 |
| ZU | No Cause Identified After investigation by both Parties | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q1 | Takeback Pumps | 916 |
| MD | Technical failures below the solebar | 893 |
| MU | Depot operating problem | 832 |
| DD | Technical Fleet Holding Code | 782 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 655 |
| M8 | Technical failures above the Solebar | 413 |
| M7 | Door and Door system faults | 408 |
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 379 |
| TG | Driver | 371 |
| J3 | Axle Counter Failure | 310 |