Shanklin
128 delay minutes
The biggest share (50%) of the delay picked up at Shanklin in the four weeks to 9 December 2023 came from other operator causes.
86% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 3 | 2% | 17% | - |
| The operators' causes | ||||
| Train faults | 28 | 22% | 16% | - |
| Traincrew | 3 | 2% | 11% | 1 |
| Stations | 15 | 12% | 3% | - |
| Operations | 15 | 12% | 5% | - |
| Operator, other | 64 | 50% | 7% | 1 |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JK | Flooding not due to exceptional weather | 58 |
| MD | Technical failures below the solebar | 28 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 15 |
| RP | Passenger dropped object whilst boarding/alighting from train and train delayed at TOC request | 6 |
| T2 | Delay at unstaffed station to non-DOO train | 6 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 6 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3 |
| R8 | Delay at Station believed to be operator cause and information required from operator (Ops Responsibility) | 3 |
| TH | (Senior) Conductor/Train Manager | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 834 |
| TZ | Other Passenger Train Operating Company causes | 583 |
| OU | Delays not Investigated by Network Rail | 547 |
| IA | Signal failure (including no fault found) | 288 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 272 |
| MD | Technical failures below the solebar | 243 |
| TG | Driver | 228 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 220 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 174 |
| XP | BRIDGE HIT | 153 |