The biggest share (30%) of the delay picked up at Shepperton in the four weeks to 9 December 2023 came from how the network was run.

95% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track423%8% 2 a day, more than 3 of the other 4 years1
Signals, points and power1099%16% 4 a day, more than 1 of the other 4 years1
Weather and structures2<1%7% 0 a day, the least in 5 years1
Autumn13411%7% 5 a day, more than 3 of the other 4 years-
External3<1%4% 0 a day, more than 1 of the other 4 years-
Network management36730%17% 13 a day, more than 3 of the other 4 years3
The operators' causes
Train faults15313%16% 5 a day, more than 2 of the other 4 years2
Traincrew11910%11% 4 a day, more than 2 of the other 4 years17
Stations1109%3% 4 a day, more than 3 of the other 4 years1
Operations222%5% 1 a day, the most in 5 years2
Operator, other16113%7% 6 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)277
ICTrack circuit failure (including no fault found)99
Q3NZ Pumps T98
TTLeaf fall Neutral98
TGDriver75
T2Delay at unstaffed station to non-DOO train59
I5Possession over-run from planned work55
M0Confirmed train cab based safety system fault (including GSMR)53
VHPassenger Communication cord, door egress or emergency train alarm operated50
IRBroken/cracked/twisted/buckled/flawed rail42
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)5,655
TGDriver1,949
MDTechnical failures below the solebar1,645
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,522
ICTrack circuit failure (including no fault found)1,289
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,237
IBPoints failure (including no fault found)1,225
TH(Senior) Conductor/Train Manager1,165
T2Delay at unstaffed station to non-DOO train1,123
TTLeaf fall Neutral1,069