2,855 delay minutes
The biggest share (16%) of the delay picked up at Shipley in the four weeks to 9 December 2023 came from how the network was run.
61% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 192 | 7% | 8% | 7 a day, the most in 5 years | 2 |
| Signals, points and power | 413 | 14% | 16% | 15 a day, the most in 5 years | 5 |
| Weather and structures | 181 | 6% | 7% | 6 a day, more than 3 of the other 4 years | 5 |
| Autumn | 249 | 9% | 7% | 9 a day, more than 1 of the other 4 years | - |
| External | 271 | 9% | 4% | 10 a day, the most in 5 years | 7 |
| Network management | 454 | 16% | 17% | 16 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 360 | 13% | 16% | 13 a day, more than 2 of the other 4 years | 4 |
| Traincrew | 359 | 13% | 11% | 13 a day, the most in 5 years | 7 |
| Stations | 38 | 1% | 3% | 1 a day, the least in 5 years | - |
| Operations | 115 | 4% | 5% | 4 a day, more than 2 of the other 4 years | 1 |
| Operator, other | 226 | 8% | 7% | 8 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 331 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 224 |
| TG | Driver | 197 |
| Q3 | NZ Pumps T | 181 |
| TT | Leaf fall Neutral | 154 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 142 |
| OU | Delays not Investigated by Network Rail | 131 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 120 |
| MU | Depot operating problem | 94 |
| TH | (Senior) Conductor/Train Manager | 93 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 4,950 |
| MD | Technical failures below the solebar | 4,934 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 3,750 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 2,886 |
| Q3 | NZ Pumps T | 2,614 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 2,400 |
| M7 | Door and Door system faults | 2,233 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,177 |
| RB | Passengers joining/alighting | 2,021 |
| M8 | Technical failures above the Solebar | 1,857 |