Southend Airport
0 delay minutes
No delay was picked up at Southend Airport in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MV | Engineers on-track equipment failure outside possession | 28 |
| I7 | Engineer's train late into, from or failed in possession | 11 |
| TG | Driver | 10 |
| OM | Technical failure associated with a Railhead conditioning train | 8 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 8 |
| VZ | Other passenger or external causes the responsibility of TOC | 5 |
| OZ | Other Network Rail operating causes | 4 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 3 |