29 delay minutes

Most of the delay picked up at St Ives (Cornwall) in the four weeks to 9 December 2023 came from faulty trains.

45% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%2
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management724%17%-
The operators' causes
Train faults2276%16%6
Traincrew--11%8
Stations--3%-
Operations--5%2
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar13
MNBrake and brake systems faults; including wheel flats where no other cause had been identified5
M7Door and Door system faults4
ZUNo Cause Identified After investigation by both Parties4
OUDelays not Investigated by Network Rail3
Since 2018
CodeWhat Network Rail loggedMinutes
M7Door and Door system faults352
RBPassengers joining/alighting273
TGDriver246
MNBrake and brake systems faults; including wheel flats where no other cause had been identified228
MDTechnical failures below the solebar211
TH(Senior) Conductor/Train Manager129
ZUNo Cause Identified After investigation by both Parties95
ZYUnivestigated station overtime System Roll-up Only92
M8Technical failures above the Solebar84
ICTrack circuit failure (including no fault found)84