Skegness
682 delay minutes
The biggest share (44%) of the delay picked up at Skegness in the four weeks to 9 December 2023 came from signal, points and power faults.
88% of these minutes were knock-on from something that happened elsewhere first. 61% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | <1% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 301 | 44% | 16% | 11 a day, the most in 5 years | 1 |
| Weather and structures | 15 | 2% | 7% | 1 a day, more than 3 of the other 4 years | - |
| Autumn | 162 | 24% | 7% | 6 a day, the most in 5 years | - |
| External | 13 | 2% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 32 | 5% | 17% | 1 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 81 | 12% | 16% | 3 a day, more than 2 of the other 4 years | 1 |
| Traincrew | 13 | 2% | 11% | 0 a day, more than 2 of the other 4 years | 3 |
| Stations | 6 | <1% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 4 | <1% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 54 | 8% | 7% | 2 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IE | Signalling Functional Power Supply Failure | 196 |
| QH | Adhesion problems due to leaf contamination | 71 |
| QJ | Special working for leaf-fall track circuit operation | 60 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 36 |
| II | Signalling lineside cable fault | 34 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 31 |
| Q3 | NZ Pumps T | 31 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 26 |
| VZ | Other passenger or external causes the responsibility of TOC | 23 |
| M8 | Technical failures above the Solebar | 19 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 1,700 |
| M8 | Technical failures above the Solebar | 1,633 |
| TG | Driver | 969 |
| M7 | Door and Door system faults | 825 |
| RB | Passengers joining/alighting | 743 |
| IB | Points failure (including no fault found) | 583 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 576 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 549 |
| IE | Signalling Functional Power Supply Failure | 545 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 544 |