Skipton
4,025 delay minutes
The biggest share (20%) of the delay picked up at Skipton in the four weeks to 9 December 2023 came from faulty trains.
66% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 329 | 8% | 8% | 12 a day, the most in 5 years | 15 |
| Signals, points and power | 456 | 11% | 16% | 16 a day, the most in 5 years | 3 |
| Weather and structures | 497 | 12% | 7% | 18 a day, the most in 5 years | 6 |
| Autumn | 226 | 6% | 7% | 8 a day, more than 1 of the other 4 years | - |
| External | 394 | 10% | 4% | 14 a day, the most in 5 years | 11 |
| Network management | 229 | 6% | 17% | 8 a day, more than 3 of the other 4 years | 33 |
| The operators' causes | |||||
| Train faults | 792 | 20% | 16% | 28 a day, more than 3 of the other 4 years | 19 |
| Traincrew | 670 | 17% | 11% | 24 a day, the most in 5 years | 76 |
| Stations | 32 | <1% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 99 | 2% | 5% | 4 a day, more than 2 of the other 4 years | 2 |
| Operator, other | 303 | 8% | 7% | 11 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 485 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 340 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 281 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 253 |
| M8 | Technical failures above the Solebar | 202 |
| MC | Diesel Loco failure, defect, attention | 197 |
| Q3 | NZ Pumps T | 188 |
| TT | Leaf fall Neutral | 176 |
| JK | Flooding not due to exceptional weather | 168 |
| TH | (Senior) Conductor/Train Manager | 164 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 8,099 |
| MD | Technical failures below the solebar | 7,033 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 3,804 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 3,381 |
| Q3 | NZ Pumps T | 2,945 |
| M8 | Technical failures above the Solebar | 2,848 |
| TH | (Senior) Conductor/Train Manager | 2,811 |
| M7 | Door and Door system faults | 2,759 |
| TT | Leaf fall Neutral | 1,982 |
| IB | Points failure (including no fault found) | 1,924 |