Saltburn
790 delay minutes
The biggest share (27%) of the delay picked up at Saltburn in the four weeks to 9 December 2023 came from signal, points and power faults.
84% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 33 | 4% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 215 | 27% | 16% | 8 a day, more than 3 of the other 4 years | - |
| Weather and structures | 42 | 5% | 7% | 2 a day, the most in 5 years | - |
| Autumn | 2 | <1% | 7% | 0 a day, the least in 5 years | - |
| External | 26 | 3% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 120 | 15% | 17% | 4 a day, the most in 5 years | 2 |
| The operators' causes | |||||
| Train faults | 150 | 19% | 16% | 5 a day, the most in 5 years | 1 |
| Traincrew | 95 | 12% | 11% | 3 a day, the most in 5 years | 22 |
| Stations | 27 | 3% | 3% | 1 a day, the most in 5 years | - |
| Operations | 72 | 9% | 5% | 3 a day, the most in 5 years | - |
| Operator, other | 10 | 1% | 7% | 0 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 124 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 57 |
| TG | Driver | 54 |
| TZ | Other Passenger Train Operating Company causes | 41 |
| OU | Delays not Investigated by Network Rail | 40 |
| TH | (Senior) Conductor/Train Manager | 39 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 31 |
| I5 | Possession over-run from planned work | 29 |
| J0 | Telecom equipment radio failure (GSM-R) | 28 |
| MC | Diesel Loco failure, defect, attention | 28 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,755 |
| IB | Points failure (including no fault found) | 1,556 |
| MD | Technical failures below the solebar | 1,340 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,053 |
| TH | (Senior) Conductor/Train Manager | 802 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 758 |
| RB | Passengers joining/alighting | 699 |
| IC | Track circuit failure (including no fault found) | 669 |
| M7 | Door and Door system faults | 608 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 555 |