6,116 delay minutes

The biggest share (32%) of the delay picked up at Slough in the four weeks to 9 December 2023 came from track faults.

75% of these minutes were knock-on from something that happened elsewhere first. 84% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1,98532%8% 71 a day, the most in 5 years4
Signals, points and power90415%16% 32 a day, more than 3 of the other 4 years3
Weather and structures1092%7% 4 a day, the most in 5 years-
Autumn41<1%7% 1 a day, more than 1 of the other 4 years-
External1092%4% 4 a day, more than 2 of the other 4 years-
Network management96016%17% 34 a day, the most in 5 years-
The operators' causes
Train faults1,09918%16% 39 a day, the most in 5 years-
Traincrew2885%11% 10 a day, more than 3 of the other 4 years2
Stations45<1%3% 2 a day, the least in 5 years-
Operations2564%5% 9 a day, the most in 5 years4
Operator, other3215%7% 11 a day, the most in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail1,107
IBPoints failure (including no fault found)579
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.510
OUDelays not Investigated by Network Rail473
ITRough ride or bumps reported - cause not known or no fault found338
M2Delay due to ATO / ETCS equipment291
TGDriver252
MNBrake and brake systems faults; including wheel flats where no other cause had been identified246
MBElectic Loco failure, defect, attention203
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)157
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)16,487
J3Axle Counter Failure12,700
TGDriver8,645
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.8,425
I1Overhead line/third rail defect7,670
IRBroken/cracked/twisted/buckled/flawed rail6,067
ICTrack circuit failure (including no fault found)4,943
M8Technical failures above the Solebar4,936
MNBrake and brake systems faults; including wheel flats where no other cause had been identified4,012
M7Door and Door system faults3,872