1,649 delay minutes

The biggest share (23%) of the delay picked up at Selly Oak in the four weeks to 9 December 2023 came from signal, points and power faults.

67% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1569%8% 6 a day, the most in 5 years-
Signals, points and power38823%16% 14 a day, the most in 5 years-
Weather and structures342%7% 1 a day, more than 2 of the other 4 years-
Autumn453%7% 2 a day, more than 2 of the other 4 years-
External22213%4% 8 a day, the most in 5 years-
Network management22414%17% 8 a day, more than 3 of the other 4 years-
The operators' causes
Train faults25615%16% 9 a day, more than 3 of the other 4 years-
Traincrew966%11% 3 a day, more than 1 of the other 4 years-
Stations1036%3% 4 a day, the most in 5 years-
Operations483%5% 2 a day, the most in 5 years-
Operator, other795%7% 3 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)216
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure160
IBPoints failure (including no fault found)139
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.115
TGDriver87
MDTechnical failures below the solebar75
MNBrake and brake systems faults; including wheel flats where no other cause had been identified60
RQUn-booked assistance for a person with reduced mobility joining/alighting,55
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards47
IRBroken/cracked/twisted/buckled/flawed rail41
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver4,083
TH(Senior) Conductor/Train Manager2,309
IBPoints failure (including no fault found)2,295
MDTechnical failures below the solebar1,833
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,831
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,691
ICTrack circuit failure (including no fault found)1,553
M8Technical failures above the Solebar1,525
RQUn-booked assistance for a person with reduced mobility joining/alighting,1,274
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)1,215