Selly Oak
1,649 delay minutes
The biggest share (23%) of the delay picked up at Selly Oak in the four weeks to 9 December 2023 came from signal, points and power faults.
67% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 156 | 9% | 8% | 6 a day, the most in 5 years | - |
| Signals, points and power | 388 | 23% | 16% | 14 a day, the most in 5 years | - |
| Weather and structures | 34 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 45 | 3% | 7% | 2 a day, more than 2 of the other 4 years | - |
| External | 222 | 13% | 4% | 8 a day, the most in 5 years | - |
| Network management | 224 | 14% | 17% | 8 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 256 | 15% | 16% | 9 a day, more than 3 of the other 4 years | - |
| Traincrew | 96 | 6% | 11% | 3 a day, more than 1 of the other 4 years | - |
| Stations | 103 | 6% | 3% | 4 a day, the most in 5 years | - |
| Operations | 48 | 3% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 79 | 5% | 7% | 3 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 216 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 160 |
| IB | Points failure (including no fault found) | 139 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 115 |
| TG | Driver | 87 |
| MD | Technical failures below the solebar | 75 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 60 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 55 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 47 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 41 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 4,083 |
| TH | (Senior) Conductor/Train Manager | 2,309 |
| IB | Points failure (including no fault found) | 2,295 |
| MD | Technical failures below the solebar | 1,833 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,831 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,691 |
| IC | Track circuit failure (including no fault found) | 1,553 |
| M8 | Technical failures above the Solebar | 1,525 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 1,274 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 1,215 |