Stowmarket
2,016 delay minutes
The biggest share (49%) of the delay picked up at Stowmarket in the four weeks to 9 December 2023 came from signal, points and power faults.
42% of these minutes were knock-on from something that happened elsewhere first. 77% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 9 | <1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 994 | 49% | 16% | 36 a day, the most in 5 years | - |
| Weather and structures | 5 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 455 | 23% | 7% | 16 a day, the most in 5 years | - |
| External | 53 | 3% | 4% | 2 a day, the most in 5 years | - |
| Network management | 280 | 14% | 17% | 10 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 92 | 5% | 16% | 3 a day, more than 1 of the other 4 years | 3 |
| Traincrew | 43 | 2% | 11% | 2 a day, more than 1 of the other 4 years | - |
| Stations | 3 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 26 | 1% | 5% | 1 a day, the least in 5 years | - |
| Operator, other | 58 | 3% | 7% | 2 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 863 |
| QJ | Special working for leaf-fall track circuit operation | 437 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 101 |
| II | Signalling lineside cable fault | 95 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 65 |
| MC | Diesel Loco failure, defect, attention | 34 |
| FW | Late start/yard overtime not explained by Operator | 33 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 30 |
| QA | WTT schedule and or LTP Process including erroneous simplifiers | 25 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 24 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,832 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,656 |
| IC | Track circuit failure (including no fault found) | 2,946 |
| MD | Technical failures below the solebar | 2,579 |
| MC | Diesel Loco failure, defect, attention | 2,127 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 2,020 |
| MU | Depot operating problem | 1,838 |
| XP | BRIDGE HIT | 1,675 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,416 |
| II | Signalling lineside cable fault | 1,269 |