Southminster
55 delay minutes
Most of the delay picked up at Southminster in the four weeks to 9 December 2023 came from faulty trains.
96% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | 5% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | - | - | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 6 | 10% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 2 | 4% | 17% | 0 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 38 | 69% | 16% | 1 a day, more than 3 of the other 4 years | 3 |
| Traincrew | 1 | 2% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 6 | 10% | 7% | 0 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M8 | Technical failures above the Solebar | 38 |
| Q3 | NZ Pumps T | 6 |
| TT | Leaf fall Neutral | 6 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2 |
| TG | Driver | 1 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 12,055 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,386 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 1,153 |
| TG | Driver | 438 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 265 |
| M8 | Technical failures above the Solebar | 198 |
| IK | Telecom equipment failure (including no fault found) | 197 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 180 |
| MD | Technical failures below the solebar | 178 |
| I5 | Possession over-run from planned work | 173 |