55 delay minutes

Most of the delay picked up at Southminster in the four weeks to 9 December 2023 came from faulty trains.

96% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track35%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power--16% 0 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn610%7% 0 a day, more than 2 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management24%17% 0 a day, the least in 5 years-
The operators' causes
Train faults3869%16% 1 a day, more than 3 of the other 4 years3
Traincrew12%11% 0 a day, more than 1 of the other 4 years-
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other610%7% 0 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M8Technical failures above the Solebar38
Q3NZ Pumps T6
TTLeaf fall Neutral6
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2
TGDriver1
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)12,055
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,386
JSCondition of Track TSR outside the Timetable Planning Rules1,153
TGDriver438
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)265
M8Technical failures above the Solebar198
IKTelecom equipment failure (including no fault found)197
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure180
MDTechnical failures below the solebar178
I5Possession over-run from planned work173