Shenfield
4,442 delay minutes
The biggest share (20%) of the delay picked up at Shenfield in the four weeks to 9 December 2023 came from how the network was run.
88% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 136 | 3% | 8% | 5 a day, the least in 5 years | 1 |
| Signals, points and power | 497 | 11% | 16% | 18 a day, the most in 5 years | 15 |
| Weather and structures | 76 | 2% | 7% | 3 a day, more than 1 of the other 4 years | - |
| Autumn | 323 | 7% | 7% | 12 a day, the most in 5 years | - |
| External | 352 | 8% | 4% | 13 a day, the most in 5 years | 1 |
| Network management | 904 | 20% | 17% | 32 a day, the most in 5 years | 4 |
| The operators' causes | |||||
| Train faults | 747 | 17% | 16% | 27 a day, more than 2 of the other 4 years | 8 |
| Traincrew | 132 | 3% | 11% | 5 a day, more than 1 of the other 4 years | 2 |
| Stations | 11 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 804 | 18% | 5% | 29 a day, more than 3 of the other 4 years | 19 |
| Operator, other | 460 | 10% | 7% | 16 a day, the most in 5 years | 4 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 670 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 313 |
| I1 | Overhead line/third rail defect | 292 |
| Q3 | NZ Pumps T | 292 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 285 |
| QM | Train schedule/STP Process including erroneous simplifiers | 230 |
| M2 | Delay due to ATO / ETCS equipment | 195 |
| MU | Depot operating problem | 190 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 189 |
| IC | Track circuit failure (including no fault found) | 150 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 23,051 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 15,110 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 8,218 |
| TG | Driver | 6,058 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 5,168 |
| MD | Technical failures below the solebar | 5,152 |
| IB | Points failure (including no fault found) | 4,690 |
| M7 | Door and Door system faults | 4,631 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,245 |
| M8 | Technical failures above the Solebar | 4,210 |