St Helens Central
1,033 delay minutes
The biggest share (19%) of the delay picked up at St Helens Central in the four weeks to 9 December 2023 came from autumn leaves.
45% of these minutes were knock-on from something that happened elsewhere first. 84% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 23 | 2% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 63 | 6% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Weather and structures | 38 | 4% | 7% | 1 a day, more than 3 of the other 4 years | 1 |
| Autumn | 196 | 19% | 7% | 7 a day, more than 3 of the other 4 years | - |
| External | 7 | <1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 74 | 7% | 17% | 3 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 162 | 16% | 16% | 6 a day, more than 2 of the other 4 years | - |
| Traincrew | 109 | 11% | 11% | 4 a day, more than 3 of the other 4 years | - |
| Stations | 18 | 2% | 3% | 1 a day, the least in 5 years | - |
| Operations | 176 | 17% | 5% | 6 a day, the most in 5 years | - |
| Operator, other | 169 | 16% | 7% | 6 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 149 |
| TZ | Other Passenger Train Operating Company causes | 126 |
| TT | Leaf fall Neutral | 90 |
| TG | Driver | 68 |
| MD | Technical failures below the solebar | 62 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 62 |
| OU | Delays not Investigated by Network Rail | 50 |
| QI | Cautioning due to railhead leaf contamination | 47 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 28 |
| MR | Sanders and scrubber faults | 27 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 3,074 |
| MD | Technical failures below the solebar | 2,089 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 1,962 |
| Q3 | NZ Pumps T | 1,514 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,109 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,076 |
| TT | Leaf fall Neutral | 958 |
| TH | (Senior) Conductor/Train Manager | 931 |
| M7 | Door and Door system faults | 874 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 838 |