1,125 delay minutes

The biggest share (25%) of the delay picked up at Strood in the four weeks to 9 December 2023 came from how the network was run.

66% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track222%8% 1 a day, the least in 5 years-
Signals, points and power393%16% 1 a day, the least in 5 years1
Weather and structures141%7% 1 a day, more than 2 of the other 4 years-
Autumn13512%7% 5 a day, more than 1 of the other 4 years-
External504%4% 2 a day, more than 1 of the other 4 years-
Network management28125%17% 10 a day, more than 2 of the other 4 years2
The operators' causes
Train faults17415%16% 6 a day, the most in 5 years4
Traincrew1029%11% 4 a day, more than 2 of the other 4 years7
Stations131%3% 0 a day, the least in 5 years-
Operations767%5% 3 a day, more than 3 of the other 4 years-
Operator, other22020%7% 8 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T135
TTLeaf fall Neutral133
I6Delays as a result of line blocks / track patrols (including late handback)60
OCSignaller including mis-routing (not ERTM /ETCS related)53
MNBrake and brake systems faults; including wheel flats where no other cause had been identified51
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)49
VHPassenger Communication cord, door egress or emergency train alarm operated45
I9Fires starting on Network Rail Infrastructure44
M0Confirmed train cab based safety system fault (including GSMR)44
TRTrain Operating Company Directive41
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)5,245
TGDriver2,871
ICTrack circuit failure (including no fault found)2,689
TTLeaf fall Neutral2,444
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,088
OCSignaller including mis-routing (not ERTM /ETCS related)2,024
IBPoints failure (including no fault found)1,907
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,862
VHPassenger Communication cord, door egress or emergency train alarm operated1,743
Q3NZ Pumps T1,361