1,125 delay minutes
The biggest share (25%) of the delay picked up at Strood in the four weeks to 9 December 2023 came from how the network was run.
66% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 22 | 2% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 39 | 3% | 16% | 1 a day, the least in 5 years | 1 |
| Weather and structures | 14 | 1% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 135 | 12% | 7% | 5 a day, more than 1 of the other 4 years | - |
| External | 50 | 4% | 4% | 2 a day, more than 1 of the other 4 years | - |
| Network management | 281 | 25% | 17% | 10 a day, more than 2 of the other 4 years | 2 |
| The operators' causes | |||||
| Train faults | 174 | 15% | 16% | 6 a day, the most in 5 years | 4 |
| Traincrew | 102 | 9% | 11% | 4 a day, more than 2 of the other 4 years | 7 |
| Stations | 13 | 1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 76 | 7% | 5% | 3 a day, more than 3 of the other 4 years | - |
| Operator, other | 220 | 20% | 7% | 8 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 135 |
| TT | Leaf fall Neutral | 133 |
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 60 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 53 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 51 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 49 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 45 |
| I9 | Fires starting on Network Rail Infrastructure | 44 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 44 |
| TR | Train Operating Company Directive | 41 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 5,245 |
| TG | Driver | 2,871 |
| IC | Track circuit failure (including no fault found) | 2,689 |
| TT | Leaf fall Neutral | 2,444 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,088 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,024 |
| IB | Points failure (including no fault found) | 1,907 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,862 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 1,743 |
| Q3 | NZ Pumps T | 1,361 |