Southport
1,130 delay minutes
The biggest share (20%) of the delay picked up at Southport in the four weeks to 9 December 2023 came from faulty trains.
41% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 46 | 4% | 8% | 2 a day, the most in 5 years | - |
| Signals, points and power | 20 | 2% | 16% | 1 a day, the least in 5 years | - |
| Weather and structures | 116 | 10% | 7% | 4 a day, more than 3 of the other 4 years | 8 |
| Autumn | 82 | 7% | 7% | 3 a day, more than 3 of the other 4 years | - |
| External | 146 | 13% | 4% | 5 a day, the most in 5 years | - |
| Network management | 120 | 11% | 17% | 4 a day, more than 1 of the other 4 years | 135 |
| The operators' causes | |||||
| Train faults | 225 | 20% | 16% | 8 a day, the least in 5 years | 6 |
| Traincrew | 177 | 16% | 11% | 6 a day, more than 2 of the other 4 years | 22 |
| Stations | 31 | 3% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | 102 | 9% | 5% | 4 a day, more than 3 of the other 4 years | 2 |
| Operator, other | 66 | 6% | 7% | 2 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 125 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 101 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 100 |
| Q3 | NZ Pumps T | 66 |
| MD | Technical failures below the solebar | 62 |
| M7 | Door and Door system faults | 60 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 57 |
| TH | (Senior) Conductor/Train Manager | 52 |
| TT | Leaf fall Neutral | 51 |
| M8 | Technical failures above the Solebar | 50 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 5,508 |
| MD | Technical failures below the solebar | 4,911 |
| TH | (Senior) Conductor/Train Manager | 2,934 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,928 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,810 |
| TR | Train Operating Company Directive | 1,510 |
| M7 | Door and Door system faults | 1,485 |
| IC | Track circuit failure (including no fault found) | 1,446 |
| M8 | Technical failures above the Solebar | 1,333 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 1,101 |