Leaves on the Line

Stoke-on-Trent

SOT West Coast South route
CSV JSON

1,071 delay minutes

The biggest share (29%) of the delay picked up at Stoke-on-Trent in the four weeks to 9 December 2023 came from faulty trains.

72% of these minutes were knock-on from something that happened elsewhere first. 83% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track192%8% 1 a day, the least in 5 years3
Signals, points and power13513%16% 5 a day, more than 2 of the other 4 years1
Weather and structures424%7% 2 a day, more than 2 of the other 4 years2
Autumn797%7% 3 a day, the most in 5 years2
External172%4% 1 a day, more than 2 of the other 4 years-
Network management12612%17% 4 a day, the most in 5 years4
The operators' causes
Train faults31229%16% 11 a day, more than 3 of the other 4 years4
Traincrew10510%11% 4 a day, more than 3 of the other 4 years1
Stations636%3% 2 a day, more than 1 of the other 4 years-
Operations192%5% 1 a day, more than 3 of the other 4 years1
Operator, other15514%7% 6 a day, the most in 5 years2

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MNBrake and brake systems faults; including wheel flats where no other cause had been identified112
TGDriver100
IHPower Supply And Distribution System Failure67
M8Technical failures above the Solebar66
MPRail / wheel interface, adhesion problems (including ice on the running rail)64
Q3NZ Pumps T62
TTLeaf fall Neutral57
MDTechnical failures below the solebar47
RBPassengers joining/alighting35
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail33
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver2,126
IRBroken/cracked/twisted/buckled/flawed rail1,933
M8Technical failures above the Solebar1,789
MDTechnical failures below the solebar1,666
IBPoints failure (including no fault found)1,537
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards1,521
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,337
I1Overhead line/third rail defect1,307
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,190
M7Door and Door system faults1,129