Stoke-on-Trent
1,071 delay minutes
The biggest share (29%) of the delay picked up at Stoke-on-Trent in the four weeks to 9 December 2023 came from faulty trains.
72% of these minutes were knock-on from something that happened elsewhere first. 83% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 19 | 2% | 8% | 1 a day, the least in 5 years | 3 |
| Signals, points and power | 135 | 13% | 16% | 5 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | 42 | 4% | 7% | 2 a day, more than 2 of the other 4 years | 2 |
| Autumn | 79 | 7% | 7% | 3 a day, the most in 5 years | 2 |
| External | 17 | 2% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 126 | 12% | 17% | 4 a day, the most in 5 years | 4 |
| The operators' causes | |||||
| Train faults | 312 | 29% | 16% | 11 a day, more than 3 of the other 4 years | 4 |
| Traincrew | 105 | 10% | 11% | 4 a day, more than 3 of the other 4 years | 1 |
| Stations | 63 | 6% | 3% | 2 a day, more than 1 of the other 4 years | - |
| Operations | 19 | 2% | 5% | 1 a day, more than 3 of the other 4 years | 1 |
| Operator, other | 155 | 14% | 7% | 6 a day, the most in 5 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 112 |
| TG | Driver | 100 |
| IH | Power Supply And Distribution System Failure | 67 |
| M8 | Technical failures above the Solebar | 66 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 64 |
| Q3 | NZ Pumps T | 62 |
| TT | Leaf fall Neutral | 57 |
| MD | Technical failures below the solebar | 47 |
| RB | Passengers joining/alighting | 35 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 33 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,126 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,933 |
| M8 | Technical failures above the Solebar | 1,789 |
| MD | Technical failures below the solebar | 1,666 |
| IB | Points failure (including no fault found) | 1,537 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 1,521 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,337 |
| I1 | Overhead line/third rail defect | 1,307 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,190 |
| M7 | Door and Door system faults | 1,129 |