Spalding
400 delay minutes
The biggest share (31%) of the delay picked up at Spalding in the four weeks to 9 December 2023 came from how the network was run.
47% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 49 | 12% | 8% | 2 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 47 | 12% | 16% | 2 a day, more than 1 of the other 4 years | 1 |
| Weather and structures | 15 | 4% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 51 | 13% | 7% | 2 a day, the most in 5 years | 1 |
| External | 35 | 9% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 125 | 31% | 17% | 4 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 17 | 4% | 16% | 1 a day, the least in 5 years | 1 |
| Traincrew | 26 | 7% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 13 | 3% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 3 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 19 | 5% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 63 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 40 |
| QH | Adhesion problems due to leaf contamination | 30 |
| XR | Cable vandalism or theft | 25 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 24 |
| QJ | Special working for leaf-fall track circuit operation | 14 |
| TH | (Senior) Conductor/Train Manager | 14 |
| MD | Technical failures below the solebar | 13 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 13 |
| FW | Late start/yard overtime not explained by Operator | 11 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,136 |
| J3 | Axle Counter Failure | 938 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 919 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 615 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 532 |
| MD | Technical failures below the solebar | 505 |
| MC | Diesel Loco failure, defect, attention | 424 |
| IA | Signal failure (including no fault found) | 308 |
| TG | Driver | 295 |
| IB | Points failure (including no fault found) | 282 |