Shepherds Well
12 delay minutes
Most of the delay picked up at Shepherds Well in the four weeks to 9 December 2023 came from faulty trains.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | 1 |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | 12 | 100% | 16% | 1 |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XP | BRIDGE HIT | 94 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 88 |
| IH | Power Supply And Distribution System Failure | 75 |
| MD | Technical failures below the solebar | 48 |
| J6 | Lightning strike against unprotected assets | 43 |
| XB | Vandalism or theft (including the placing of objects on the line) | 36 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 29 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 26 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 21 |
| IC | Track circuit failure (including no fault found) | 20 |