The biggest share (41%) of the delay picked up at London St Pancras International LL in the four weeks to 9 December 2023 came from how the network was run.

89% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track815%8% 3 a day, more than 2 of the other 4 years1
Signals, points and power25616%16% 9 a day, more than 2 of the other 4 years20
Weather and structures312%7% 1 a day, more than 1 of the other 4 years10
Autumn181%7% 1 a day, the least in 5 years-
External262%4% 1 a day, more than 1 of the other 4 years2
Network management67141%17% 24 a day, more than 3 of the other 4 years4
The operators' causes
Train faults1197%16% 4 a day, more than 1 of the other 4 years24
Traincrew22014%11% 8 a day, more than 3 of the other 4 years178
Stations1298%3% 5 a day, the most in 5 years-
Operations--5% 0 a day, the least in 5 years6
Operator, other755%7% 3 a day, more than 1 of the other 4 years3

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)273
TGDriver169
RXStation delay due overcrowding due unplanned events or incident (line or station closure) where causal event is not determined100
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)97
M8Technical failures above the Solebar58
ICTrack circuit failure (including no fault found)56
I1Overhead line/third rail defect51
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.51
IBPoints failure (including no fault found)50
OBDelayed by signaller not applying applicable regulating policy48
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver12,099
M8Technical failures above the Solebar8,578
ICTrack circuit failure (including no fault found)6,906
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.6,039
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)5,046
IBPoints failure (including no fault found)4,211
OCSignaller including mis-routing (not ERTM /ETCS related)3,366
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)3,126
I1Overhead line/third rail defect2,886
TITraincrew rostering problem2,659