4,955 delay minutes

The biggest share (22%) of the delay picked up at Stockport in the four weeks to 9 December 2023 came from signal, points and power faults.

50% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track93819%8% 34 a day, the most in 5 years-
Signals, points and power1,11322%16% 40 a day, the most in 5 years1
Weather and structures77216%7% 28 a day, the most in 5 years2
Autumn1804%7% 6 a day, more than 2 of the other 4 years-
External1964%4% 7 a day, more than 3 of the other 4 years-
Network management54711%17% 20 a day, more than 2 of the other 4 years3
The operators' causes
Train faults4669%16% 17 a day, the least in 5 years7
Traincrew2425%11% 9 a day, more than 1 of the other 4 years2
Stations1232%3% 4 a day, the least in 5 years-
Operations1142%5% 4 a day, more than 2 of the other 4 years-
Operator, other2655%7% 9 a day, more than 2 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail812
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure509
IBPoints failure (including no fault found)405
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail390
JKFlooding not due to exceptional weather369
OUDelays not Investigated by Network Rail184
TGDriver181
XPBRIDGE HIT140
MPRail / wheel interface, adhesion problems (including ice on the running rail)127
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.126
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver9,527
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure8,926
IBPoints failure (including no fault found)8,774
MDTechnical failures below the solebar7,136
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)5,796
M8Technical failures above the Solebar4,933
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4,279
ICTrack circuit failure (including no fault found)4,243
IRBroken/cracked/twisted/buckled/flawed rail4,129
M7Door and Door system faults3,908