Stratford (London)
5,360 delay minutes
The biggest share (16%) of the delay picked up at Stratford (London) in the four weeks to 9 December 2023 came from signal, points and power faults.
80% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 635 | 12% | 8% | 23 a day, the most in 5 years | 71 |
| Signals, points and power | 876 | 16% | 16% | 31 a day, the most in 5 years | 16 |
| Weather and structures | 216 | 4% | 7% | 8 a day, more than 3 of the other 4 years | - |
| Autumn | 56 | 1% | 7% | 2 a day, the most in 5 years | - |
| External | 217 | 4% | 4% | 8 a day, the most in 5 years | - |
| Network management | 688 | 13% | 17% | 25 a day, more than 2 of the other 4 years | 17 |
| The operators' causes | |||||
| Train faults | 566 | 11% | 16% | 20 a day, more than 1 of the other 4 years | 21 |
| Traincrew | 660 | 12% | 11% | 24 a day, the most in 5 years | 3 |
| Stations | 230 | 4% | 3% | 8 a day, more than 1 of the other 4 years | - |
| Operations | 807 | 15% | 5% | 29 a day, the most in 5 years | 1 |
| Operator, other | 410 | 8% | 7% | 15 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 603 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 392 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 383 |
| I1 | Overhead line/third rail defect | 334 |
| IA | Signal failure (including no fault found) | 247 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 241 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 172 |
| RB | Passengers joining/alighting | 154 |
| M8 | Technical failures above the Solebar | 152 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 150 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 21,412 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 8,620 |
| RB | Passengers joining/alighting | 7,548 |
| IB | Points failure (including no fault found) | 6,790 |
| M7 | Door and Door system faults | 5,791 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 5,311 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 5,097 |
| MD | Technical failures below the solebar | 4,989 |
| J3 | Axle Counter Failure | 4,610 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,335 |