Stapleton Road
525 delay minutes
The biggest share (21%) of the delay picked up at Stapleton Road in the four weeks to 9 December 2023 came from signal, points and power faults.
64% of these minutes were knock-on from something that happened elsewhere first. 70% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 36 | 7% | 8% | 1 a day, the most in 5 years | - |
| Signals, points and power | 110 | 21% | 16% | 4 a day, the most in 5 years | - |
| Weather and structures | 19 | 4% | 7% | 1 a day, the most in 5 years | - |
| Autumn | 86 | 16% | 7% | 3 a day, the most in 5 years | - |
| External | 36 | 7% | 4% | 1 a day, the most in 5 years | - |
| Network management | 65 | 12% | 17% | 2 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 54 | 10% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Traincrew | 36 | 7% | 11% | 1 a day, the most in 5 years | - |
| Stations | 3 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 81 | 15% | 7% | 3 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 77 |
| TT | Leaf fall Neutral | 77 |
| I4 | OHLE/third rail power supply failure or reduction | 48 |
| I2 | AC/DC trip (including no fault or cause found) | 36 |
| TG | Driver | 36 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 36 |
| M8 | Technical failures above the Solebar | 34 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 32 |
| OU | Delays not Investigated by Network Rail | 16 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 16 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M7 | Door and Door system faults | 831 |
| MD | Technical failures below the solebar | 656 |
| TG | Driver | 564 |
| IB | Points failure (including no fault found) | 495 |
| M8 | Technical failures above the Solebar | 480 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 466 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 409 |
| J3 | Axle Counter Failure | 399 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 393 |
| ZU | No Cause Identified After investigation by both Parties | 382 |