795 delay minutes

The biggest share (35%) of the delay picked up at South Ruislip in the four weeks to 9 December 2023 came from signal, points and power faults.

56% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track739%8% 3 a day, more than 2 of the other 4 years-
Signals, points and power28235%16% 10 a day, the most in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn273%7% 1 a day, more than 1 of the other 4 years-
External354%4% 1 a day, the least in 5 years-
Network management435%17% 2 a day, the least in 5 years-
The operators' causes
Train faults21727%16% 8 a day, more than 1 of the other 4 years1
Traincrew537%11% 2 a day, the least in 5 years-
Stations111%3% 0 a day, the least in 5 years-
Operations385%5% 1 a day, the least in 5 years-
Operator, other162%7% 1 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)241
MDTechnical failures below the solebar75
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.60
M0Confirmed train cab based safety system fault (including GSMR)46
TGDriver45
IBPoints failure (including no fault found)32
M7Door and Door system faults30
XPBRIDGE HIT28
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)20
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident18
Since 2018
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)6,464
MDTechnical failures below the solebar6,254
TGDriver4,372
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,646
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,073
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure3,054
M8Technical failures above the Solebar2,966
IBPoints failure (including no fault found)2,387
MCDiesel Loco failure, defect, attention2,370
M7Door and Door system faults1,993