Shoeburyness
163 delay minutes
The biggest share (39%) of the delay picked up at Shoeburyness in the four weeks to 9 December 2023 came from faulty trains.
63% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 28 | 17% | 16% | 1 a day, more than 3 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 2 | 1% | 7% | 0 a day, the most in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 6 | 4% | 17% | 0 a day, more than 1 of the other 4 years | 8 |
| The operators' causes | |||||
| Train faults | 64 | 39% | 16% | 2 a day, the most in 5 years | - |
| Traincrew | 32 | 20% | 11% | 1 a day, more than 3 of the other 4 years | 3 |
| Stations | 3 | 2% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 28 | 17% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 32 |
| MU | Depot operating problem | 28 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 26 |
| MD | Technical failures below the solebar | 20 |
| J0 | Telecom equipment radio failure (GSM-R) | 19 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 9 |
| IC | Track circuit failure (including no fault found) | 4 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 4 |
| I2 | AC/DC trip (including no fault or cause found) | 3 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,913 |
| MU | Depot operating problem | 933 |
| M8 | Technical failures above the Solebar | 675 |
| MD | Technical failures below the solebar | 655 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 590 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 438 |
| I1 | Overhead line/third rail defect | 414 |
| QM | Train schedule/STP Process including erroneous simplifiers | 360 |
| TW | Driver adhering to company professional driving standards or policy | 334 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 334 |