Stansted Airport

SSD Anglia route
CSV JSON

870 delay minutes

The biggest share (31%) of the delay picked up at Stansted Airport in the four weeks to 9 December 2023 came from signal, points and power faults.

86% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track556%8% 2 a day, more than 1 of the other 4 years1
Signals, points and power27131%16% 10 a day, the most in 5 years2
Weather and structures566%7% 2 a day, the most in 5 years-
Autumn111%7% 0 a day, more than 3 of the other 4 years-
External14817%4% 5 a day, the most in 5 years1
Network management12915%17% 5 a day, more than 2 of the other 4 years4
The operators' causes
Train faults11313%16% 4 a day, more than 1 of the other 4 years5
Traincrew394%11% 1 a day, more than 2 of the other 4 years12
Stations4<1%3% 0 a day, more than 1 of the other 4 years-
Operations1<1%5% 0 a day, the least in 5 years-
Operator, other445%7% 2 a day, more than 2 of the other 4 years5

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I2AC/DC trip (including no fault or cause found)209
XPBRIDGE HIT142
M7Door and Door system faults63
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed55
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards53
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.50
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure40
TGDriver38
VHPassenger Communication cord, door egress or emergency train alarm operated36
I5Possession over-run from planned work22
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.6,485
MDTechnical failures below the solebar3,201
IBPoints failure (including no fault found)2,437
M8Technical failures above the Solebar2,323
TGDriver2,235
IRBroken/cracked/twisted/buckled/flawed rail1,902
M7Door and Door system faults1,870
ICTrack circuit failure (including no fault found)1,863
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,525
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail1,439