Stansted Airport
870 delay minutes
The biggest share (31%) of the delay picked up at Stansted Airport in the four weeks to 9 December 2023 came from signal, points and power faults.
86% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 55 | 6% | 8% | 2 a day, more than 1 of the other 4 years | 1 |
| Signals, points and power | 271 | 31% | 16% | 10 a day, the most in 5 years | 2 |
| Weather and structures | 56 | 6% | 7% | 2 a day, the most in 5 years | - |
| Autumn | 11 | 1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | 148 | 17% | 4% | 5 a day, the most in 5 years | 1 |
| Network management | 129 | 15% | 17% | 5 a day, more than 2 of the other 4 years | 4 |
| The operators' causes | |||||
| Train faults | 113 | 13% | 16% | 4 a day, more than 1 of the other 4 years | 5 |
| Traincrew | 39 | 4% | 11% | 1 a day, more than 2 of the other 4 years | 12 |
| Stations | 4 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 1 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 44 | 5% | 7% | 2 a day, more than 2 of the other 4 years | 5 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I2 | AC/DC trip (including no fault or cause found) | 209 |
| XP | BRIDGE HIT | 142 |
| M7 | Door and Door system faults | 63 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 55 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 53 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 50 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 40 |
| TG | Driver | 38 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 36 |
| I5 | Possession over-run from planned work | 22 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 6,485 |
| MD | Technical failures below the solebar | 3,201 |
| IB | Points failure (including no fault found) | 2,437 |
| M8 | Technical failures above the Solebar | 2,323 |
| TG | Driver | 2,235 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,902 |
| M7 | Door and Door system faults | 1,870 |
| IC | Track circuit failure (including no fault found) | 1,863 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,525 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 1,439 |